The application that 3 water chestnut communicate system of drive of servo main shaft to go up in CNC Machining center
- Time:
- Click:112
- source:SHERBURNE CNC Machining
92kW. (2) main shaft is the largest cutting power. When when main shaft power of the biggest cutting arises for force of the biggest milling, the cutting bear of main shaft. When using work of medium carbon steel of milling of milling cutter of high-speed steel end panel, force of the biggest milling can use next form calculation: Set V=40m/min of rate of the biggest milling, can seek a power of the biggest cutting (3) main shaft advocate the transmission cable length at numerical control machine tool is shorter for transmission power, advocate transmission overall efficiency takes higher numerical value 0.
85, era can get PE=2 into numerical value.
39kW. Regard drive of servo of a complete set of as the system, main shaft driving unit and capacity of main shaft electromotor already had made 3 water chestnut match, according to the design power is more than advocate the principle of transmission power, the model of electromotor of SJ-PF series main shaft that chooses for H400 vertical machining center is SJ-PF5.
5, driving unit model is MDS-A-SPJA-55, the capacity is 5.
5kW, corresponding output power is 3.
7kW, specified rate is 1500r/min, 2 electromotor all are contained inside coder Tibetan type and cooling fan. 3, system of main shaft drive and CNC connector machining center use system of numerical control of the INCON-M40F that accords with industrial PC standard open architecture to make give priority to controller, the main shaft motion that system of this numerical control communicates servo drive system to finish machining center through 1 is controlled, system of drive of 3 servo feed finishs X, y, z 3 feed linkage control of direction, expand through 2 PLC complex logic dominates action of the I/O board machine tool that finish again (include library of management of way of work of numerical control system, handwheel management, knife to change knife, duplex operation automatically to make fixed position of graduation of an exchange, workbench stop to wait for) , logistic control software uses C++ language development, achieve the harmonious administration of each subsystem by the 80586CPU of numerical control system. The machining center that is core with system of INCON-M40F numerical control is electric total construction is like control system the graph is shown 2 times. Graph 2 machining center are electric the total construction that controls a system pursues the 3 connector that give priority to axial drive system. Electrical outlet of terminal of wiring of 9 strong report and 3 signal cable is shared on driver of MDS-A-SPJA series main shaft CN1, CN2, CN3. Terminal of wiring of 9 strong report is respectively: Power source of AC 220V three-phase enters line R, s, t, hand in - straight - make frequency conversion advocate the C of terminal of wiring of resistance of apply the brake of dc side specific power consumption of loop, p, output U of dynamical line terminal to the frequency conversion of power supply of main shaft electric machinery, v, w reachs PE of terminal of screen line wiring. Signal cable CN3 is used at join CNC system and PC, among them SE1, SE2 dictates with the imitate voltage that will accept numerical control system (± 10V) , SYA, SYA, SYB, SYB3, SYC and SYC3 are from main shaft driving unit remands the line of current rate feedback of CNC (6 cent are A, b two-phase each 2, photograph of 0 pulse Z 2) , TX1, RX1, GND is respectively serial send, receive line and ground wire, use at the serial mouth of join PC, the moving parameter that makes main shaft driving unit, accurate stop parameter beforehand set and monitoring of main shaft condition, when moving normally, need not join. CN2 is the standard cable that company of 3 water chestnut offers, with will deliver main shaft coder to be opposite the speed of main shaft driving unit / positional feedback signal. CN1 cable has 40 lines, the axis that basically serves as main shaft accuses PLC signal, be joined the I/O at PMC of numerical control system is nodded, control in order to finish CNC to the condition monitoring of main shaft and movement. There is representative signal to be in CN1: FA, FC, OSSEND, INCW, INCCW, INALM sends the PMC to numerical control system by main shaft driver, deliver the current condition of main shaft driver, namely FA and FC put through state main shaft calls the police, OSSEND indicates main shaft to stop a movement to had reached the designated position definitely, INCW, INCCW, INALM indicates main shaft to be in turning, the;REDAY in invert or calling the police, SRI, SRN, OSS, EMG is sent by the PMC of numerical control system to main shaft driver, deliver CNC to command to the control of main shaft, namely REDAY is signal of be in order, SRI commands to turning, SRN commands to invert, OSS commands to allow to stop, EMG is urgent cease an order. There still are 2 lines SM0 and LM0 on CN1 cable, can join main shaft speedometer and laden list secondhand with ground wire G respectively, the face plate that is used at numerical control machine tool shows. Graph the connector of system of drive of 3 main shaft 4, the parameter of system of main shaft drive is whole decide driving unit of main shaft of series of MDS-A-SPJA of 3 water chestnut to share 384 in-house parameter from SP001-SP384, these parameter need to pass join of hardware of become enamoured condition, circuit and moving function requirement to undertake according to machinery reasonable adjust. When be being debugged actually, some parameter use initiative and acquiescent value, some parameter should fasten the exterior signal wiring of all to close suitably with main shaft, return some parameter by advocate transmission structure and performance demand are firm. Machining center main shaft is debugged in use typical parameter give a demonstration is as follows. SP001: Stop return gain definitely, use acquiescent value. SP004: Stop width of v/arc be on the throne definitely, the setting is 1/16. SP006: Stop decelerate to lead definitely, use acquiescent value. SP007: Stop positional numerical value definitely, if hope main shaft fixed position stops at X ° position, but ° of corresponding setting SP007=x / 360 ° × 4096. SP017: Top speed of main shaft electric machinery, set is 6000. SP019: Speed set is worth add / slowdown time is invariable, set is 30ms. SP025: Main shaft side ages teeth of a cogwheel is counted. SP029: Electric machinery side ages teeth of a cogwheel is counted, the scale of SP029 and SP025 should according to advocate transmission is actual transmission is 1 ∶ than setting 2. SP039, SP040, s0041: Specify model of driving unit capacity, electric machinery and type of resistor of apply the brake of specific power consumption respectively. SP098, SP099, SP100: It is the P of speed return gain respectively, i, d. SP129 ~ SP133: Press number of requirement limits buy, appoint driving unit to accept the input line that place of exterior input signal uses, if pass setting SP129=1, the 19A that can define CN1 brings a foot to regard as stop command OSS to input end definitely. SP178, SP179: Use at speed, load to express scale to adjust. SP141 ~ SP143: Press number of requirement limits buy, appoint driving unit condition to output uses output line. If pass setting SP141=0, the 7A that can define CN1 brings a foot to regard as stop the signal that finish to output end definitely: Through installing SO142=11, the condition monitoring that can define the 7B of CN1 to bring a foot to regard driving unit as be in order outputs end. Return some machines several need are positional setting, be like SP097, this parameter is pressed 2 into make share 16, arrive from the 0th F, among them the 1st combination with the 0th expresses to allow to stop direction of rotation, buy 01 choices square to stop; definitely the 3rd position 1 during expressing to allow to stop servo, main shaft lock decides; to choose coder the 5th times to detect polarity, buy of more than of short duration is buy 0; if 0, criterion SP097=0009H. If the graph is shown 4 times,parameter rectifies the curve of actual measurement of speed of machining center main shaft after deciding. Graph 4a is quickened for main shaft - firm fast (the curve of dynamic rate change to 1000r/min)- decelerate process, speed rise time is about 0.
2s, quantity exceeding tone is less than 0.
The curve of dynamic rate change when 25%; graph 4b gives priority to an axis to make calm angle stop from the stable rate of 1000r/min, the constant speed among the curve paragraph control rate for positional loop, the mark is worn main shaft controls mode to turn into from speed the position controls mode, main shaft falls in normal traversal speed from stop a command to give out to definitely stop fixed position to end to need about definitely 0.
5s, transfer the process is smooth. Function of main shaft static state achieves 3000 ∶ for timing scope 10, without static difference. Graph curve of actual measurement of speed of 4 main shaft carries out a proof, the reasonable set of parameter can develop systematic intelligence to influence harmonious ability, system of driving unit of implementation main shaft, CNC and main shaft electromotor coordinate carry to go, make advocate the static state that transmission has stability, dynamic function. 5, we are in the last word below academic calculative guidance, for vertical, horizontal 2 machining center chose capacity of main shaft system, finished the signal join between system of drive of CNC main shaft, adjusted the in-house parameter of driver of 2 main shaft respectively according to systematic requirement, machining center runs a circumstance to prove: Capacity of main shaft system designs appropriate, signal to join correct, parameter cooperates proper, play gave the intelligence of system of drive of main shaft of 3 water chestnut to change a dominant position, overall the machining performance demand that achieved place to anticipate. CNC Milling CNC Machining